Skip to main content

Night Sky

2 min read

NASA Now Aims to Launch Artemis 1 Moon Mission on Sept. 3 After Glitch

The Artemis 1 stack on the launch pad at NASA's Kennedy Space Center in Florida. (Image credit: NASA/Joel Kowsky)

The shakeout cruise for the first mission of NASA's Artemis program, a project aiming to establish a human presence on and around the moon by the end of the decade, was supposed to begin on Monday, August 29. However, the failure of one of the four engines powering the rocket to reach the desired temperature – about minus 420 degree Fahrenheit – prior to ignition could not be troubleshot in time for Monday's launch and led to Monday's launch attempt being scrubbed.

However, the Artemis 1 team believes an adjustment to the countdown plan – starting the engine-cooling process 30 to 45 minutes earlier will allow the sensor on Engine 3 to work correctly and make it possible to complete the countdown now rescheduled for this Saturday afternoon. Of course, even if all the technical analyses support a launch of Saturday afternoon, the threat of showers and thunderstorms along Florida's east coast could cause a further delay to the beginning of the rocket's trip to the moon.

Meanwhile, if everything does go according to the new plan, Artemis 1 will launch from Pad 39B at NASA's Kennedy Space Center (KSC) during a two-hour window opening at 11:17 a.m. PDT and you can watch the liftoff, courtesy of NASA, at Space.com.

Keep lookin' up — Collin O'Mara Green